How to Install a Split System Air Conditioner: The Steps, and Why DIY Is Illegal in WA

If you are searching for how to install a split system air conditioner, the first thing to know is that the answer has two halves. The first half is the sequence of steps, which is straightforward to understand and worth knowing so you can judge a quote and inspect the finished job. The second half is who is allowed to do each step, and in Western Australia that is not you, unless you hold the right licences. This post explains both, step by step, so you know what a proper split system installation involves and why the licensing exists.

It is the practical companion to our full guide on split system air conditioner installation in Perth, which covers sizing, energy labels and what to ask before you accept a quote.

The short answer: can you install a split system yourself?

Not legally, in most cases. Two pieces of regulation sit in the way:

  • Refrigerant. The Australian Refrigeration Council (ARC) states that a Refrigerant Handling Licence must be held by any person who carries out work on refrigeration and air conditioning equipment, including installing and commissioning, and that handling fluorocarbon refrigerant without a licence is an offence.
  • Electricity. In Western Australia, electrical work must be carried out by a person authorised by a licence or permit under the Electricity (Licensing) Regulations 1991. Building and Energy’s fact sheet says refrigeration and air-conditioning restricted electrical licence holders are not authorised to install or alter fixed wiring, so the circuit and isolator need a fully licensed electrician.

That is why a licensed team is the only legitimate route. You can still do your homework on how it works, and you should.

Infographic showing the eight steps of a split system air conditioner installation

Tap or click the infographic to open it full size.

How to install a split system air conditioner: the steps

1. Choose the size and the positions

Everything starts with capacity and location. The unit should be sized to the room, using the labelled capacity and a calculation that includes ceiling height, windows, insulation and shading. CHOICE’s ballpark guide runs from 2 to 2.5 kW for rooms up to 20 square metres to 6 to 9 kW for rooms over 80 square metres, and our post on what size split system you need shows how to work it out. The indoor unit goes high on a wall where air can travel across the room. The outdoor unit goes where it has airflow, a firm base and little chance of annoying anyone with noise.

2. Mount the indoor unit bracket

The mounting plate is fixed to the wall into studs or suitable fixings, and checked with a level. The indoor unit hangs from this plate, so a crooked or weak mounting leads to noise, drain problems and a unit that looks wrong on the wall. The wall behind has to be checked for cables and pipes before anything is drilled.

3. Drill the wall and run the pipework

A hole is drilled through the wall for the refrigerant lines, drain and interconnect cable. Two insulated copper pipes carry the refrigerant, and a drain line takes condensate away. The pipework is run to the outdoor unit and protected from sun and knocks. Joints are formed carefully, because a poor flare or a kink is one of the most common sources of slow refrigerant leaks.

4. Set the outdoor unit

The outdoor unit is placed on a pad or a wall bracket, levelled and secured. It needs clearance around the coil for airflow, and it should sit where hot air from the fan is not recirculated. In Perth’s heat, shade and clearance both help efficiency.

5. Connect the electrical supply

This step must be done by a licensed electrician. It includes the dedicated circuit from the switchboard, the isolator near the outdoor unit and the connections between the units where they are not simple factory-supplied cable. This is the part that WA law reserves for fully licensed electricians.

6. Pressure test and evacuate the lines

Before any refrigerant is released, the pipework is pressure tested to confirm it does not leak, and then a vacuum pump removes air and moisture from the lines and indoor coil. Air and moisture in a refrigerant circuit cause poor performance and shorten compressor life, which is why this step is never skipped on a proper job.

Technician commissioning a split system outdoor unit with a vacuum pump and gauges at an Australian home

Evacuating and leak testing the lines is the step that protects the compressor.

7. Release refrigerant and commission

The service valves are opened and the system is run in cooling and heating. The technician checks pressures and temperatures, drain flow, airflow and noise. This is where the licensed refrigerant handling matters most, particularly with R32, which is mildly flammable. Our guide to R32 refrigerant in Perth homes explains what that means in practice.

8. Handover and walk-through

The installer shows you the remote, timers and modes, how to remove and clean the filters, and what to expect from the first few days of running. You should receive the model and serial numbers, the warranty information and confirmation of the licences used. Then the mess is cleaned up.

What goes wrong when a split system is installed badly?

The most common faults from a poor split system installation are predictable: water leaking from the indoor unit because the drain has no fall, refrigerant lost through a bad joint, noise from a loose bracket or a poorly placed outdoor unit, poor performance from a wrongly sized unit, and electrical faults from incorrect wiring. CHOICE adds a sizing warning that applies to every install. A unit that is too big short cycles and wears out faster, and a unit that is too small runs flat out and dries the air. If a unit is not cooling properly after installation, the cause is often the install, not the unit, and it is worth reading our guide to why an air conditioner is not cooling before you assume the model is faulty.

How to install a split system air conditioner without the stress

  1. Get two or three written quotes that name the exact model, capacity and what is included.
  2. Ask for licence numbers. You want an ARC refrigerant licence and a WA electrical licence on the job.
  3. Agree the positions of both units and the pipe route before installation day.
  4. Book before the season peaks. Our note on the best time to install air conditioning in Perth covers it.
  5. Check the finished job against the list above: level indoor unit, tidy pipe cover, drain that drains, a quiet outdoor unit, a walk-through of the controls.

Our team handles every step, from sizing to commissioning, for homes and businesses across Perth. See the split system installation in Perth page for the service, or the wider overview of air conditioning installation in Perth.

After the install: filters, settings and the first summer

A new split system runs at its best when the owner looks after two simple things. The first is the filter. Manufacturers ask owners to clean the washable filters behind the front panel regularly, and a clogged filter is one of the most common reasons a near-new unit seems to lose its punch. Our step-by-step guide on how to clean an air conditioner filter shows how to do it safely. The second is the remote. Cool, dry, fan and auto modes all behave differently, and our explainer on air conditioner symbols and modes decodes the icons for Daikin, Mitsubishi Electric, Fujitsu and Panasonic. If the unit still is not keeping up after that, read why an air conditioner is not cooling, and for the full buying and licensing picture go back to our split system and reverse cycle installation guide.

How to install a split system air conditioner: frequently asked questions

How do you install a split system air conditioner?

A licensed installer sizes the unit, mounts the indoor bracket, drills the wall, runs insulated copper pipework and a drain, sets the outdoor unit, connects the electrical supply, pressure tests and evacuates the lines, releases the refrigerant, commissions the system and walks you through the controls.

Can I install a split system myself in WA?

In most cases no. Handling refrigerant without an ARC licence is an offence, and fixed electrical wiring in Western Australia must be done by a licensed electrician under the Electricity (Licensing) Regulations 1991.

Does a DIY installation void the warranty?

It can. Many manufacturers require installation by a licensed, authorised installer, and the ARC has promoted the use of licensed technicians partly to protect warranties. Check your unit’s warranty terms before you decide who installs it.

How do I find the right size split system?

Start with the room area using CHOICE’s ballpark table, then refine for ceiling height, windows, insulation and shading, and size on the 35 degree cooling capacity on the energy label. Our guide to sizing walks through it room by room.

What licences should my installer have?

An Australian Refrigeration Council licence for the refrigerant work, and an electrical licence for any electrical work, as WA law requires. Ask for both numbers on the quote.

How long does it take to install a split system?

It depends on the pipe run, the wall construction and the electrical work. A back-to-back install with a short pipe run is the quickest job, while a long run, a second storey, a multi head system or a switchboard upgrade all add time. Your written quote should state the expected time on site.

How do you disconnect or remove a split system?

Removing a split system means recovering the refrigerant, which the Australian Refrigeration Council treats as licensed work: decommissioning is listed alongside installing and servicing in its licence scheme. The electrical supply also has to be isolated safely. Book a licensed technician rather than cutting the lines yourself.

What is the 3 minute rule for air conditioners?

Many air conditioners wait a few minutes before restarting the compressor after it stops, to protect it. If the unit does not start the moment you switch it back on, give it a few minutes. Our guide to air conditioner symbols and modes explains what the remote is doing while it waits.

Want it done properly the first time?

Licensed local team. Free quote, no obligation. Call (08) 6200 9718.

Get a free quote

Sources